Colorado painting company · specialist crews for every kind of work25% off labor on painting projects booked by December 31, 2026 · Paint and materials not included. Book winter dates
720-208-5645
HomeInterior crewTrim & doorsWinter interior paintingExterior crewCabinet crewCommercial crewDeck & fence crewSpecialty coatings crewWhole-home repaintsVirtual estimateTwo-minute walkthroughWhat it costsInterior cost calculatorColor pickerPaint calculatorExterior paint calculatorHow long painting takesWhere we workOlder homes and lead paintFix a bad paint jobThe warrantyQuestionsPainting guidesWho we areContactCall 720-208-5645
Interior crew · trim and doors

Trim and doors that look new again.

Baseboards, casings, crown, doors and railings, finished in a hard enamel that stands up to kids, dogs and vacuums.

By the Painter Hotline crew · Updated

Short answer

Painter Hotline's interior crew repaints baseboards, door and window casings, crown molding, interior doors and stair railings across Denver and the Front Range. We clean and degloss, fill and sand, caulk the gaps Colorado's dry winter air opens up, prime where needed and finish in a durable trim enamel. Photo estimates usually come back within one business day, or we come out. 5-year written workmanship warranty.

Why trim is its own job

Walls are flat and forgiving. Trim is the opposite: narrow edges, profiles, nail holes, joints and a glossier finish that shows every brush mark and every bump underneath it. It is also the part of a room that takes the most abuse. Baseboards get hit by vacuums and kicked by shoes, door edges get grabbed, and stair railings get handled every day. That is why trim gets a different product, a different prep routine and more time per foot than the walls around it.

It is also why fresh trim changes how a whole room reads. Clean, crisp white baseboards and doors make tired walls look better and freshly painted walls look finished. Plenty of homeowners call us for trim alone, especially before listing a house or after years of scuffs.

What we paint

SurfaceWhat it usually needs
Baseboards and shoe moldingDegreasing, scuff repair, caulk at the wall and floor line, two coats of enamel
Door and window casingsFilling nail holes, re-caulking miters that have opened, sanding drips from past coats
Crown moldingCaulking the top gap where it meets the ceiling, careful cut lines on both edges
Interior doorsRemoving hardware, painting panels in the right order, edges sealed so they do not stick
Stair railings, spindles and newel postsHeavy cleaning of hand oils, sanding, bonding primer, extra cure time before heavy use
Built-in shelves and window seatsSame enamel system as doors, with shelf edges left to cure before loading

Colorado's dry air and your trim

If the caulk lines along your baseboards and casings have cracked open, or the miters at the corners of your door frames have pulled apart, that is not just age. Wood trim shrinks and swells with indoor humidity, and the Front Range is dry. Denver Health points out that humidity at altitude is already low and drops further in winter, and Trane lists contracting, cracking wood trim and corner drywall cracks among the classic signs of low indoor humidity.

That movement is why we use a flexible, paintable caulk at every joint between trim and wall, and why we re-cut joints that have opened rather than smearing filler over them. Painting in winter has an advantage here: the trim is at its driest and smallest, so gaps we caulk now are less likely to reopen than gaps caulked in a humid stretch of summer.

Oil-based trim in older homes

Many Denver-area homes built before the 1990s have oil-based enamel on the trim. Water-based paint applied straight over glossy oil can peel off in strips, sometimes months later. We test before we paint. If the existing coat is oil, it gets cleaned, sanded to a dull surface and primed with a bonding primer before the new enamel goes on. Skipping that one step is one of the most common reasons we get called to fix a trim job someone else did.

Homes built before 1978 have a second consideration: door jambs, window sashes and other friction surfaces are some of the most likely places to find lead-based paint. Paid work that disturbs more than 6 square feet of painted surface inside a pre-1978 home falls under the EPA Renovation, Repair and Painting rule. Tell us the year your home was built, and see how we handle older homes.

How a trim job runs

  1. Protect. Floors, carpet edges and walls get covered and taped. Door hardware comes off and gets bagged and labeled by door.
  2. Clean and degloss. Hand oils and kitchen grease are the enemy of adhesion. Every surface gets washed and scuff-sanded.
  3. Repair. Nail holes and dents filled, split corners glued, open joints caulked, old drips sanded flat.
  4. Prime where needed. Bare wood, filler, stains and oil-based coats get primer; sound latex trim usually does not.
  5. Two coats of enamel. Brushed and rolled on most trim; doors and railings sprayed or brushed depending on the profile and the room.
  6. Hardware back on and a walkthrough. We check every door for sticking and every edge in good light with you.

Finish and sheen

Most trim looks and wears best in satin or semi-gloss. Semi-gloss wipes clean more easily and reads crisper next to flat or matte walls. Satin hides small imperfections in old, dented trim better. We use enamels made for trim, which level out brush marks and cure harder than wall paint. One thing to know: trim enamel is dry to the touch the same day but keeps hardening for days to weeks, so we leave doors propped open the first night and ask you to go easy on scrubbing for the cure time listed on the product.

Painting doors: in place or off the hinges?

Both work. Doors painted in place stay hung, so rooms stay usable and nothing has to be stored. Doors taken off and laid flat get the smoothest finish, especially if they are sprayed, but they need somewhere to dry. For a whole-house door refresh, we usually take them down, finish them in batches and rehang them, so you are never without more than a few doors at a time. For a handful of doors, in place is faster.

What affects the price

  • Condition. Lightly scuffed latex trim is quick. Chipped, dented, oil-coated or heavily caulked trim takes more prep than painting.
  • Profile. Flat 1950s casing is fast; tall colonial baseboard and stacked crown take longer per foot.
  • Doors. Flat slab doors are quicker than six-panel or shaker doors, and both sides count.
  • Color changes. Going from stained wood to painted, or from dark to white, adds primer and sometimes a third coat.
  • Combined with walls. Trim done in the same visit as walls and ceilings costs less per foot than trim alone, because setup and protection happen once.

See published ranges on what painting costs, price whole rooms with the interior cost calculator, or send photos of a few doors and a stretch of baseboard for a virtual estimate. Prefer someone to look in person? We will come out.

A good winter job

Trim and doors are some of the best projects to book in the cold months: everything is inside, the furnace keeps temperatures steady for the enamel, and our winter interior dates are more open than spring and summer. If walls, ceilings and trim are all due, the interior crew can do the whole room in one visit.

Questions

Quick questions

Do I need to paint trim and walls at the same time?

No. Trim-only jobs are common, especially before listing a home. Doing both in one visit is more efficient because protection and setup happen once.

Can you paint over oil-based trim with latex?

Yes, if it is prepared correctly. We clean it, sand it dull and use a bonding primer first. Latex applied straight over glossy oil enamel often peels.

What sheen is best for baseboards and doors?

Satin or semi-gloss. Semi-gloss cleans easiest and looks crisp; satin hides dents and imperfections in older trim better.

Why do the caulk lines on my trim keep cracking?

Wood trim moves as indoor humidity changes, and Colorado air is very dry in winter. Flexible caulk, properly re-cut joints and painting when the wood is dry make cracks less likely to come back.

How long before I can close freshly painted doors?

Trim enamel is dry to the touch the same day but keeps curing. We leave doors open the first night so edges do not stick, and recommend gentle use until the product cure time has passed.

Free estimate

Walls that will not touch up?

Send photos of the walls or rooms. We will tell you honestly whether a touch-up will work or the wall needs repainting.

Free estimateIn writingFully insured5-year warranty

Prefer to talk it through? 720-208-5645

How would you like your free estimate?

Both are free and the choice is yours. Color matching, repairs and older homes often go better in person; straightforward rooms are usually quicker from photos.

Used only to prepare your estimate. Need it faster? Call 720-208-5645.

Call nowVirtual estimate